Grid Connection Assurance
Track a generator's grid-connection assurance end to end — connection projects and their requirements, the submissions and technical reviews that satisfy them, dependencies between requirements, evidence, connection risks and the exceptions that block progress.
Its central question:
For this connection, is every requirement satisfied by an accepted submission and technical review, are dependencies resolved, and is every risk and exception managed before energisation?
This is one component of the Renewable Generation Orchestration reference suite.
The spine
Project → Requirements (→ Dependencies) → Submissions → Technical Reviews → Evidence, with Connection Risks and Connection Exceptions
The documents
| Page | What's in it |
|---|---|
| 00 — Overview | What the app is, the domain, the 8 models, the demo scenario |
| 01 — Quick Reference | Menu map, every model, key status vocabularies, the demo data set |
| 02 — System Diagram | The data model as a diagram (+ interactive viewer) |
| 03 — Phase 2 Scope | The runtime not yet built: workflow, governance, events |
Status
Phase 1 (built): all 8 models render as an AI-Safe CRUD register with a dashboard, seeded with one coherent scenario (10 rows).
Phase 2 (scoped, not built): the connection workflow (requirement identified→accepted), requirement-acceptance gating (a requirement accepts only on an accepted submission + technical review), dependency resolution, risk rating (rating = likelihood × consequence, a derived field) and the published connection events — see page 03.
Prototype system; draft. All facilities, people and records in the demo data are fictional.